KJSL empowers success through cutting edge mining solutions
we hold an incredible track record of performance with each operation counting as a story in mining achievement.
Operations
SL.NO. | Name of Work | Client | Location | Project Cost (in INR Lacs) |
---|---|---|---|---|
1 | Removal of all type of materials (Hard OB) at New Majri Sector I (A) & Sector II (A) Extension OCM of Majri Area. | Western Coalfields Limited | New Majri Sector I (A) & Sector II (A) Extension OCM of Majri Area, M.H | 60,069.72 |
2 | Hiring Of Hemm (Shovel, Dumer Tipper, Dozer, Grader, Fog Canons, Pay Loder, Etc) At Gevra | South Eastern Coalfields Limited | Gevra Area, Gevra CHHATTISGARH | 27,635.20 |
3 | Removal of all type of materials (Hard OB) in all kinds of strata by hiring of equipment at Makardhokra – III OCM of Umrer Area. | WESTERN COALFIELDS LIMITED | Makardhokra – III OCM of Umrer Area, M.H | 1,08,341.58 |
4 | Hiring of Surface Miner & allied equipments at Gevra Expansion Project, Gevra Area for Mechanical excavation/cutting of coal | South Eastern Coalfields Limited | Gevra Area, Gevra CHHATTISGARH | 1,62,752.09 |
5 | Diversion Channel Cutting for Pedran Nallah -Soft OB (Without Drilling), Soft OB (Without Drilling) | Mahanandi Coalfields Limited | Mahanadi Coal Fields Limited (MCL), Samleshwari OCP, Village-Kudopali, At/Po-Brajrajnagar, Dist-Jharsuguda, State-Odisha | 1,94,493.10 |
6 | COAL EXTRACTION AND OB REMOVAL WORK | Adani Enterprises Ltd. | Parsa, M.H | 81,936.49 |
SL.NO. | Name of Work & Location | Division | Total Work Value (in INR Lacs) |
---|---|---|---|
1 | Deployment and operation of suitable capacity of Surface Miners and allied equipment at Gevra OCM, Gevra area, Tehsil: Katghora, Dist: Korba, PIN- 495452, Chhattisgarh | South Eastern Coalfields Limited | 11,136.06 |
2 | Hiring of Tippers for transportation of coal (-100 mm size/250mm/ROM) from coal face (LK seam, Amgaon) to JRS no. 1&2 at Gevra Project. | South Eastern Coalfields Limited | 2,441.03 |
3 | Hiring of Tippers for transportation of coal (-100 mm size/250mm/ROM) from coal face (LK seam, Amgaon) to JRS no. 1&2 at Gevra Project. | South Eastern Coalfields Limited | 1,422.07 |
4 | Removal of all type of materials in all kinds of strata by hiring of equipments of Umrer Area M.H | Western Coalfields Limited (Gokul) | 36,817.81 |
5 | Loading of Coal free from extraneous materials into wagons by hired pay loaders at Ghugus Area. | Western Coalfields Limited (Ghughus) | 488.50 |
6 | Removal of all type of materials in all kinds of strata by hiring of equipments of Umrer Area M.H | Western Coalfields Limited (Umrer) | 60.26 |
7 | COAL EXTRACTION AND OB REMOVAL WORK | Adani Mining Private Limited | 76,897.31 |
Our Fleet
With a world class fleet and the determination to utilise the best available technologies, KJSL is equipped to deliver its clients’ mining needs
Technology
We are proud to partner with world leading providers of mining equipment and technology